01/12/2021 - Appointment of Non-Voting Adviser to the Panel for the Municipal Year 2021/22 ref: 62887    Recommendations Approved

Decision Maker: Environment and Climate Change Portfolio Holder

Decision published: 02/12/2021

Effective from: 10/12/2021

Wards/Areas affected: (All Wards/Areas);

Lead officer: Andrew Seaman


18/11/2021 - Milton Road Development - Transfer to Harrow Strategic Development Partnership ref: 62884    Recommendations Approved

Decision Maker: Cabinet

Made at meeting: 18/11/2021 - Cabinet

Decision published: 19/11/2021

Effective from: 27/11/2021

Decision:

RESOLVED: That

 

(1)            the extension of the current Pre-Contract Services Agreement (PCSA) between the Council and Wates to allow for Royal Institute of British Architects (RIBA) stage 4 design and preparation for the demolition of Civic 9, be agreed;

 

(2)            the Corporate Director of Community, following consultation with the Portfolio Holder for Strategy, Regeneration, Partnerships and Devolution and Portfolio Holder for Housing, be authorised to agree the terms of the extension to the existing PCSA and to enter into all appropriate legal documentation;

 

(3)            the Harrow Strategic Development Partnership (HSDP) be commissioned to carry out the demolition and redevelopment of the site at Milton Road under a Community Works Agreement as provided for in the founding documents of the HSDP; and

 

(4)            the Chief Executive, following consultation with the Corporate Director of  Community, the Leader of the Council and Portfolio Holder for Strategy, Regeneration, Partnerships and Devolution and the Portfolio Holder for Housing, be authorised to agree the terms of and formally enter into the Community Works Agreement.

 

Reasons:  To enable the development of housing on the Milton Road site taking the benefit of funding granted under the Building Council Homes for Londoners programme

 

Alternative Options Considered and Rejected:  As set out in the report.

 

Conflict of Interest relating to the matter declared by Cabinet Member/Dispensation Granted:  None.


18/11/2021 - Household Support Fund ref: 62882    Recommendations Approved

Decision Maker: Cabinet

Made at meeting: 18/11/2021 - Cabinet

Decision published: 19/11/2021

Effective from: 18/11/2021

Decision:

RESOLVED:  That

 

(1)            the allocation of the Household Support Fund as set out in the officer report and specifically the Council Tax Support (CTS) and Emergency Accommodation (EA) options be approved as follows:

 

a.     For CTS, the Working Age households’ option at £40 to be paid in one instalment;

b.     For EA, the Household with Children option at £36 per month for the time of the grant.

 

(2)            the Household Support Fund Policy set out in Appendix 1 to the officer report, be approved;

(3)            the Corporate Director of Resources, following consultation with the Portfolio Holder for Finance & Resources, be authorised to make minor changes to the scheme and to manage the small reserve of £32,399.78;

(4)            the purchase of vouchers for elements identified in the officer report relating to Council Tax Support, Emergency Accommodation and the Emergency Support Scheme, through a compliant procurement route be approved; and

(5)            the Corporate Director Resources, following consultation with the Portfolio Holder for Finance & Resources be authorised to (1) finalise and make decisions on any issues pertaining to the HSF and (2) award a contract for the purchase of the vouchers that the Council will directly administer.

Reasons:  The recommendations meet the criteria as set out by Department for Work and Pensions (DWP).  Those criteria provide broad discretion with a focus for 50% of the scheme on families with children.  The Council had considered from the limited data available where best to focus the funding.  The proposals provided a spectrum of support together with focus so that the funding was not spread too thinly.  The proposal eligibility criteria cover the following:

 

·       Free school meals and Council tax support which have historically been found to provide effective support to vulnerable families;

·       Harrow’s Community Hub support. This is a joint venture with the community and voluntary sector, which is effective in providing essential food support quickly to vulnerable residents;

·       Emergency accommodation and general support to help stop vulnerable people spiralling into acute difficulties following a critical one-off event; and

·       Administration support which included enlisting the aid of Citizens Advice Harrow (CAH) to act as the main referral route into the emergency support scheme. If CAH know the history of the household, they can screen clients for eligibility before referring on to the Council.

 

Alternative Options Considered and Rejected:  As set out in the report.

 

Conflict of Interest relating to the matter declared by Cabinet Member/Dispensation Granted:  None.

 

[The Chair of the Overview and Scrutiny Committee has waived call-in of these decisions for the reasons set out in the published notice.]


18/11/2021 - Award of Contract for Provision and Hosting of Pensions Administration IT System ref: 62885    Recommendations Approved

Decision Maker: Cabinet

Made at meeting: 18/11/2021 - Cabinet

Decision published: 19/11/2021

Effective from: 27/11/2021


18/11/2021 - Frameworks for Minor Works, Electrical Works, Mechanical Works, Professional Services and Planned and Preventive Maintenance and Compliance (PPM&C) ref: 62880    Recommendations Approved

Decision Maker: Cabinet

Made at meeting: 18/11/2021 - Cabinet

Decision published: 19/11/2021

Effective from: 27/11/2021

Decision:

RESOLVED:  That

 

(1)            to extend, increase values and re-procure the Authority’s Frameworks for Minor Works, Electrical Works, Mechanical Works and Professional Services Frameworks for a period of up to 1 year as follows:

 

a.     Minor, Mechanical and Electrical Works Frameworks:

                               i.     the current contracts, expiring 30 November 21, be extended by up to 12 months;

                             ii.     the current framework values be increased by a max of £5.6m broken down as Minor Works (£1.6m), Mechanical Works (£2m) and Electrical Works (£2m); and

                            iii.     a re-procurement exercise for all the services at an anticipated value of £28m over a 4-year term be commenced

 

b.     Professional Services Framework:

                               i.     current contracts expiring 19 May 2022 on the professional services framework be extended by up to 6 months;

                             ii.     the current framework value be increased by a maximum of £1.5m across all lots; and

                            iii.     a re-procurement exercise for this service at an anticipated value of £3m over a 4-year term be commenced.

 

(2)            the Corporate Director of Community, following consultation with the Portfolio Holder for Environment and Climate Change, the Portfolio Holder for Finance and Resources and the Director of Finance, be authorised to finalise the procurement of the Minor, Mechanical and Electrical Works and Professional Services Frameworks and make an award of Contract/s following the completion of a compliant procurement process (noting that operational responsibility for the delivery of this process is with the Interim Divisional Director of Environmental Services);

 

(3)            to procure a new Planned and Preventative Maintenance and Compliance Framework (PPM&C) at an anticipated value of £9m over a 4-year term, to cover the provision of refurbishment and building works to both Corporate Sites and Schools; and

 

(4)            the Corporate Director of Community, following consultation with the Portfolio Holder for Environment and Climate Change, the Portfolio Holder for Finance and Resources and the Director of Finance, be authorised to finalise the procurement of the Planned and Preventative Maintenance and Compliance Framework and make an award of Contract/s following the completion of a compliant procurement process (noting that operational responsibility for the delivery of this process is with the Interim Divisional Director of Environmental Services).

Reason:  Whilst the Harrow Works Framework arrangements were being reviewed, it was considered necessary to review the Professional Services Framework that was due to expire on 19 May 2022 and to align all Frameworks to run concurrently.

 

The Council should ensure that the Scope of Works / Services between all these frameworks interface and co-ordinate with each other.  As an example, some of the PPM&C scope may be “extracted” from the existing scope of works / services contained within the current Minor Works / Electrical Works and Mechanical Works Framework Agreements.

 

There was insufficient time to review and procure / re-procure these new Framework Agreements before the expiry of the current Framework Agreements.

 

Alternative Options Considered and Rejected:  As set out in the report.

 

Conflict of Interest relating to the matter declared by Cabinet Member/Dispensation Granted:  None.

Wards/Areas affected: (All Wards/Areas);


18/11/2021 - "Kodak" Wealdstone Footbridge - Land assembly and Compulsory Purchase Order (CPO) ref: 62878    Recommendations Approved

To obtain Cabinet approval to enter into agreements and undertakings to acquire through negotiation with the owners or persons with any legal interest in the non-Council owned land at the development site (“the Land”) which is required to construct the Kodak footbridge and if attempts to secure the land and rights required for the construction of the Kodak footbridge through negotiations fail or are being delayed, to carry out work in preparation for the making of a CPO. Also pursuing procurement options and seek Cabinet approvals as required.

Decision Maker: Cabinet

Made at meeting: 18/11/2021 - Cabinet

Decision published: 19/11/2021

Effective from: 27/11/2021

Decision:

Having noted the confidential appendix to the report, Cabinet

 

RESOLVED: That

 

(1)            the Corporate Director of Community be authorised to carry out work in preparation for the making of a Compulsory Purchase Order (CPO) in respect of the Property as shown in edged red on the attached plan at Appendix 10 to the officer report).  The work will include:

 

·       appointment, if necessary, of land referencers to review all interests in the Property and produce a draft schedule and plan for the CPO; and

 

·       serve request for information notices under section S16 of the Local Government (Miscellaneous Provisions) Act 1976 on those potentially affected by the proposed CPO;

 

(2)            the Corporate Director Community, be authorised to negotiate with landowners (freehold owners and leasehold owners) and to acquire property through private treaty;

 

(3)            that Officers be instructed to bring a further report to seek authority to secure the making, confirmation, and implementation of a CPO if the Property cannot be acquired by private treaty;

 

(4)            the Direct Award to Network Rail (NWR) as the supplier to build the bridge in accordance with Regulation 12(7) of the Public Contracts Regulations 2015 relating to contracts to establish co-operation between contracting authorities as set out in Appendix 2 to the officer report, be approved;

 

(5)            the option of pursuing a competitive tender process following the design phase of the project, in the event that the final proposal from Network Rail was unsatisfactory or did not provide value for money, be approved;

 

(6)            the Corporate Director of Community, following consultation with the Director of Finance and Deputy Leader and Portfolio Holder for Finance and Resources, be authorised to award contract to NWR following the evaluation of the Direct Award option or make a decision not to pursue that route and instead undertake procurement to identify a build partner to award contract(s) for the delivery of the Pedestrian Bridge; and

 

(7)            pursual of a Direct Award to NWR, be approved (the Cabinet Report dated 20 May 2021 foresaw a competitive process only).

 

Reasons:  Funding has been secured from Ministry of Housing, Communities and Local Government (MHCLG) by way of Future High Street Fund (FHSF) to construct the Kodak Footbridge.  There were five parcels of land that need to be purchased.  Negotiations are still ongoing with the landowners to acquire the Property.  In addition to the construction costs there will be associated costs with regards to legal fees, Land referencing fees and compensation for businesses and landowners.  The costs will be funded from the FHSF.  The construction of the Kodak Footbridge, the CPO and all associated costs were unlikely to exceed £8.9m, which was made up from the funding provided by the FHSF plus £1.76m from the Borough CIL.  The CPO process must begin by December 2021 to meet the FHSF requirements to build the footbridge by early 2024.  The CPO process can take up to 18 months.

 

The procurement option would allow the Council to collaborate with NWR to deliver the project within budget.  If contractors were required to undertake the works, it was expected that NWR will commission the contractors using their own competitively procured frameworks.

 

The Planning application for the bridge was submitted on 04.10.2021 (Appendix 5 to the officer report).

 

Alternative Options Considered and Rejected:  As set out in the report.

 

Conflict of Interest relating to the matter declared by Cabinet Member/Dispensation Granted:  None.

Wards/Areas affected: (All Wards/Areas);

Lead officer: Director of Environment


18/11/2021 - Approval to consult on the Small Sites Design Code Supplementary Planning Document (SPD) ref: 62877    Recommendations Approved

To receive a draft Small Sites Design Code Supplementary Planning Document and approve it for public consultation.

Decision Maker: Cabinet

Made at meeting: 18/11/2021 - Cabinet

Decision published: 19/11/2021

Effective from: 27/11/2021

Decision:

RESOLVED:  That

 

(1)            the draft Small Sites Design Code SPD, set out in Appendix 1 to the officer report, be approved for public consultation; and.

 

(2)            the Interim Chief Planning Officer, following consultation with the Leader of the Council and Portfolio Holder for Strategy, Regeneration, Partnerships and Devolution, be authorised to consider and agree any minor amendments and consultation arrangements required to finalise the document for consultation.

 

Reasons:  Preparation and adoption of a Small Sites Design Code SPD provided specific design guidance to assist in the determination of planning applications that fell within the definition of a small site development.  The production of a Design Code SPD will ensure general conformity with London Plan (2021) Policy H2 (small sites), and will assist applicants in bringing forward such sites, whilst meeting good design standards, which are by their nature often awkward to deliver.

 

The Small Sites Design Code SPD will assist in increasing housing delivery from this potential source and furthermore will assist in enabling Harrow to meet its housing targets as set out in The London Plan (2021).

 

Alternative Options Considered and Rejected:  As set out in the report.

 

Conflict of Interest relating to the matter declared by Cabinet Member/Dispensation Granted:  None.

Wards/Areas affected: (All Wards/Areas);

Lead officer: Head of Planning


18/11/2021 - Short Breaks for Children and Young People with Special Educational Needs and Disabilities ref: 62881    Recommendations Approved

1.         Approval to commence a competitive procurement process for Shortbreaks Service

 

2.         Delegate authority to the Corporate Director, People Services, following consultation with Portfolio Holder for Education and Social Services for Children and Young People, Portfolio Holder for Adults and Social Care and the Portfolio Holder for Finance & Resources, to award the contract.

Decision Maker: Cabinet

Made at meeting: 18/11/2021 - Cabinet

Decision published: 19/11/2021

Effective from: 27/11/2021

Decision:

RESOLVED:  That

 

(1)            the commencement of a competitive procurement process for a Short Breaks Service be agreed; and

 

(2)            the Corporate Director of People Services, following consultation with Portfolio Holder for Education and Social Services for Children and Young People, Portfolio Holder for Adults and Social Care, and the Portfolio Holder for Finance & Resources, be authorised to award the contract, following the competitive procurement process.

 

Reasons:  The Authority is required under the Children and Families Act 2014 for Local Authorities to commission services which provide families in need of respite, with a choice in provision.

 

Alternative Options Considered and Rejected:  As set out in the report.

 

Conflict of Interest relating to the matter declared by Cabinet Member/Dispensation Granted:  None.

Wards/Areas affected: (All Wards/Areas);

Lead officer: Corporate Director, People


18/11/2021 - Request for authority to award the housing domestic and commercial gas contracts ref: 62883    Recommendations Approved

Cabinet is requested to:

 

1.     In line with internal governance process, Cabinet approval is sought for additional budget for the domestic gas heating contract term, to commence award of contract to the winning bidder.

 

2.     Award delegated authority to the Divisional Director of Housing in consultation with the Portfolio Holders for Housing and Finance & Resources to award the commercial gas heating contract following a mini-competition tender exercise.

 

3.     Authorise the award of the domestic heating gas contract to the winning tenderer by granting the increase in budget as necessary for a 4-year contract from 03/01/2022 to 02/01/2026 with an option to extend for up to a further two years (4+2).  The total value of this contract(s) for the initial four-year term will be £4,065,872.36.  The value of the two-year contract extension if used will be £2,032,936.18.

 

4.     Approve the award of the commercial contract to the winning tenderer following a competitive mini-tender competition, for a 4-year contract from 6/12/2021 to 5/12/2025.  The total value of this contract(s) for the initial four-year term will be £587,427.80.  The value of the two-year contract extension if used will be £293,713.90.

 

5.     Delegate authority to the Corporate Director of Community, following consultation with the Portfolio Holders for Housing and Finance & Resources and Director of Finance to award a new contract.

Decision Maker: Cabinet

Made at meeting: 18/11/2021 - Cabinet

Decision published: 19/11/2021

Effective from: 27/11/2021

Decision:

Having noted the confidential appendices to the report, Cabinet

 

RESOLVED:  That

 

(1)            the award of the domestic gas heating contract to Liberty Group for a period of 4 years commencing 28/02/2022 to the 01/03/2026, with an option to extend for a further two years, be approved and the Corporate Director of Community, following consultation with Portfolio Holders for Housing and Finance and Resources, be authorised to carry out any contractual matters with respect to the above;

 

(2)            the award of the commercial gas heating systems contract to Thermoserve for a period of 4 years commencing 14/02/2022 to the 15/02/2026, with an option to extend for a further two years, be approved and the Corporate Director of Community, following consultation with Portfolio Holders for Housing and Finance and Resources, be authorised to carry out any contractual matters with respect to the above;

 

(3)            approval for the budget and authority to commence procurement of commercial gas heating system which was being sought retrospectively as set out in resolution 2 above, be noted;

 

(4)            for 2021/22 the part year impact of the contracts, £10,367 and one-off costs of internal project support up to a maximum of £35,000 be funded from the Housing Revenue Account (HRA) repairs reserve; and

 

(5)            from 2022/23 the full year cost, £0.878m, of the above contracts be funded from the following sources:

 

·       existing revenue budgets within the Housing Revenue Account -£0.600m,

·       Community Centre and General fund budgets -£0.025m

·       the boiler installation, capitalised repairs and unallocated budget within the housing capital programme (min £0.178m to max £0.300m budget permitting),

·       revenue savings of £0.075m from a savings to the contract by converting to new technologies over the term of the contract.

 

Reasons: The approval was being sought so that the Council would be able to continue to provide essential services to meet its statutory duties as a social housing landlord across Council homes within the Borough, whilst complying with Health and Safety Gas Regulations.

 

Alternative Options Considered and Rejected:  As set out in the report.

 

Conflict of Interest relating to the matter declared by Cabinet Member/Dispensation Granted:  None.

Wards/Areas affected: (All Wards/Areas);

Lead officer: Divisional Director, Housing Services


18/11/2021 - Grange Farm Regeneration - Phases 2 and 3 ref: 62879    Recommendations Approved

Cabinet is requested to approve the principle of appointing the Harrow Strategic Development Partnership (HSDP) to take forward the redevelopment of Phase 2 and 3 Grange Farm and commission the HSDP to develop a detailed Business Plan.

Decision Maker: Cabinet

Made at meeting: 18/11/2021 - Cabinet

Decision published: 19/11/2021

Effective from: 27/11/2021

Decision:

Having noted the confidential appendix to the report, Cabinet

 

RESOLVED:  That

 

(1)            progress on Phase 1 Grange Farm be noted;

 

(2)            the principle of appointing the Harrow Strategic Development Partnership (HSDP) to take forward the redevelopment of Phase 2 and 3 Grange Farm, be agreed; and

 

(3)            the Corporate Director of Community be authorised to commission the HSDP to develop a detailed Business Plan which would be brought back to Cabinet for final approval.

Reasons:  To enable delivery of the Grange Farm estate regeneration project.

 

Alternative Options Considered and Rejected:  As set out in the report.

 

Conflict of Interest relating to the matter declared by Cabinet Member/Dispensation Granted:  None.

Wards/Areas affected: (All Wards/Areas);

Lead officer: Divisional Director, Housing Services


18/11/2021 - Revised Statement of Principles - Gambling Act 2005 ref: 62876    Recommend Forward to Council

The Gambling Act 2005 places a responsibility on local authorities to publish a gambling statement of principles (policy) every three years. The last policy was published in January 2018. This is a reportreport seeking approval to adopt the proposed revised statement of principles.

Decision Maker: Cabinet

Made at meeting: 18/11/2021 - Cabinet

Decision published: 18/11/2021

Effective from: 18/11/2021

Decision:

Resolved to RECOMMEND: (to Council)

 

(1)            That the Revised Statement of Principles, as set out in Appendix A to the officer report, be recommended to Council for approval, noting the following:

 

a)    each application would be considered on its own individual merits without regard to demand and regulate gambling in the interests of public interest; and

 

b)    each application should uphold the three gambling objectives:

 

·       Preventing gambling from being a source of crime or disorder, being associated with crime and disorder or being used to support crime

·       Ensuring that gambling is conducted in a fair and open way

·       Protecting children and other vulnerable persons from being harmed or exploited by gambling

 

(2)            That a “no casino” resolution be continued as previously agreed by the Authority as there is no evidence base to show the need for a casino or the benefits of such an establishment (the policy continues to support well-run, compliant gambling premises).

 

[Call-in did not apply to the decisions above as they are reserved to Council]

 

RESOLVED:  That the Revised Statement of Principles as set out in Appendix A to the officer report, be recommended to Council for approval.

 

Reasons:  The Authority has a statutory obligation to review and publish its gambling statement of principles every three years.  A full consultation had been undertaken in relation to this policy.

Wards/Areas affected: (All Wards/Areas);

Lead officer: Corporate Director, Community